Our group ran into a few hiccups while trying to schedule for filming dates. At first we chose Sunday, December 18th and Monday, December 19th to have two days of filming. However, we wanted to use the Osmo Raw X 5 and the Osmo + cameras. Not everyone was available on those days as well so we had to reschedule for the following Monday, December 26th after Christmas. Another problem we ran into for shooting on this day was that our star actor caught the flu and was unable to come. Instead we used Sam Herndon as our lead role. We all met up downtown at 11 AM to begin filming. We ended up filming from 11:30 AM to 5:30 PM and we were able to film all of the necessary shots for the film. However, after editing we discovered 2 shots we wanted to re-film due to errors by Sam Herndon or quality. We decided to meet on January 6th to re-shoot. Overall, we were able to shoot the entire film in two days.